| RECHARGING |
|
|
|
Recharging of battery during
exploitation is carried out if a capacity drop (discharge) occurred
due to malfunction in vehicle or idleness of battery (longer than 90
days). In case of discharge, the battery shall be recharged within 48
hours. If this time is exceeded sulphation of the plates will occur,
substantially reduces battery capacity and lifetime.
Recharging shall be carried out in the following order, conformity with the manufacturer's instructions:
Upon recharging, check electrolyte level, wipe the battery clean, degrease the terminal posts and install the battery, as per instruction.
|

